jibhi.life
menu

plan your trip · road status

jibhi road conditions: is the road open today?

the jibhi road (nh 305 from aut through banjar) is open all year and only shuts for hours or days after heavy monsoon rain or a big snowfall. the one stretch that closes for months is jalori pass, 12 km above the village, blocked by snow from mid or late december to about march.

two stretches cause nearly every closure. one is aut to banjar on nh 305 (landslides, july to mid-september). the other is pandoh to aut on the chandigarh-manali highway, the gorge you drive through before the jibhi turn-off. this page shows what is normal month by month, what went wrong in 2025 and 2026, and how to check before you leave.

last updated

is the road to jibhi open today?

the road to jibhi is open today unless it is raining hard in the monsoon or snowing in winter, and the box below is the quickest read. it shows the live weather at jibhi village (open-meteo, ~1,800 m). steady rain between july and mid-september means landslide risk on aut-banjar and pandoh-aut that same day. snow in december to february means jalori pass is shut and the shaded bends below shoja carry ice. clear and dry, which is most days from late september to june, means the road is normal.

right now in jibhi

checking the sky over jibhi…

live conditions via open-meteo. mountain weather turns fast. treat this as a hint, not a promise.

is the road to jibhi open in november 2026?

the road to jibhi was open on 19 november 2026, and jalori pass was open to buses too. we checked hrtc's booking site (online.hrtchp.com) that afternoon. it was selling seats for 20 and 21 november on both aut to jibhi buses: service 731 at 06:30 and service 824 at 11:00, ₹83 each. it was also selling the two anni to kullu buses that cross jalori pass. service 844 leaves anni at 06:00, reaches jalori at 07:50 and jibhi at 08:15. service 827 leaves anni at 07:00 and reaches jibhi at 11:20. both cost ₹112 from anni to jibhi. from kullu to anni, services 731, 824 and 765 were on sale at ₹272.

the weather backs that up. jibhi village had no snow from 1 to 18 november 2026 and about 11 mm of rain, spread over four days. jalori pass had about 6 cm of modelled snowfall on 13 and 15 november. its coldest night was -6.6°C on the 15th (open-meteo archive, on the jibhi in november page). that is a dusting, not a closure: the buses kept their slots. expect ice on the shaded bends above shoja before about 10 am.

what this check can and cannot tell you: seat sales show hrtc plans to run the bus, not that a slide has not come down since. a news search on 19 november 2026 turned up no closure of nh 305 or the pandoh-aut highway this month. for the day you travel, use the steps under how to check.

road into jibhi
nh 305, aut → larji → banjar → jibhi, ~30 km, about 1 hr; open all year
highway before it
chandigarh-manali highway (nh 3) to the aut tunnel; pandoh-aut is the landslide stretch
jalori pass (nh 305 above jibhi)
open to cars about april to mid december; snowbound mid/late dec to ~march
monsoon risk
july to mid-september: landslides, closures of hours to days; 18 aug 2025 aut-banjar shut
winter risk
black ice on shaded bends early and late; jalori blocked with 56 other kullu roads in jan 2026
best months for the drive
late september to november, and april to june
night driving
avoid; narrow, unlit, single-lane patches from aut
check before leaving
homestay the evening before; hrtc seat sales; seoc closed-roads count via the tribune
status on 19 november 2026
aut-jibhi open; jalori pass open, hrtc selling seats over it for 20-21 nov
last verified
19 november 2026

which roads do you drive to reach jibhi?

to reach jibhi you drive two roads. the first is the chandigarh-manali highway (nh 3, also called the kiratpur-manali highway) through bilaspur, sundernagar, mandi and the pandoh gorge. it brings you to the aut tunnel, 458 km from delhi and about 240 km from chandigarh. the second is nh 305, which leaves the highway just before the aut tunnel and climbs through larji and banjar to jibhi in about 30 km. it then carries on over jalori pass to anni and luhri. nh 305 is 97 km long from aut to sainj on nh 5 (wikipedia).

from manali, kullu or bhuntar airport you join nh 305 at aut from the other direction and skip the pandoh gorge entirely. from shimla or narkanda the short way comes over jalori pass from the anni side, so it only works when the pass is open.

what is the aut to jibhi road like?

the aut to jibhi road is paved but narrow for a national highway: single-lane patches, potholes after every monsoon, no street lights and sheer drops to the tirthan below larji. nh 305 was declared a national highway in 2012, yet the widening project has stalled, and banjar residents took to the streets on 1 april 2025 over its condition (the tribune). in dry weather it is an easy hour: aut to banjar about 22 km, banjar to jibhi about 8 km. the aut to jibhi page walks through it, with hrtc buses at ₹83 and taxis at ₹1,200-2,200.

the stretch is landslide-prone in the monsoon. on 18 august 2025 landslides stopped all traffic between aut and banjar after a cloudburst in kullu district (the tribune). aut to jibhi reopened first for small vehicles, while the road above jibhi towards jalori stayed shut longer. in winter the road itself stays open, but black ice forms on shaded bends in the early morning and after dark, so drive it between about 10 am and 3 pm. the is jibhi safe page covers the ice, the river and night driving.

when is jalori pass closed?

jalori pass is closed to vehicles from mid or late december until about march, and open to cars from about april to mid december. the pass sits at ~3,120 m, about 9°C colder than jibhi. nights there drop below freezing on most nights from november (modelled, open-meteo, 2016-2025, on the jalori pass page). the first road-closing snow normally comes from mid to late december.

the winter of 2024-25 shows how long it can stay shut. the bus service over the pass resumed at the start of february 2025 after 36 days of closure. then about 25 cm of snow on 5 february closed nh 305 to all vehicles again. by 9 february nhai had reopened it for 4x4s only, with hrtc buses to follow once the road was fully clear (the tribune). on 31 january 2026 heavy snow had nh 305 at jalori blocked along with 56 other roads in kullu district (the week). none of this touches jibhi village itself: the jibhi snowfall page has the village vs pass odds.

a fix is on paper. in december 2024 the union ministry of road transport approved the alignment of a 4.16 km jalori tunnel under the pass. it would run from the shoja side (approach road 5.48 km from ghiyagi) to bhargol near anni. it saves only 8 km of road but would give banjar and anni an all-weather link (the tribune). as of april 2025 it was still at the planning stage, so plan winter trips as if the pass is shut.

where does the delhi or chandigarh to jibhi highway get blocked?

the delhi or chandigarh to jibhi highway gets blocked in the mandi gorge, on the pandoh to aut stretch of nh 3, far more often than anywhere on the plains. this is the gorge just before your turn-off, where the highway squeezes between the beas and cut hillsides. on 1 august 2025 a massive landslide at kainchi mod near pandoh made the highway impassable. heavy vehicles were held at nagchala and jhiri, and light vehicles were sent round via kamand and kataula (the tribune).

nine days later, on 9-10 august 2025, landslides shut the same highway for about 18 hours overnight. when it reopened at noon, traffic ran one-way at 9 mile, kainchi mod, dwada and jhalogi. travellers had sheltered with the army's ecological task force between hanogi and thalaut, and flash flooding had filled the rains nala tunnel (the tribune). the practical lesson for a jibhi trip: an overnight volvo from delhi that is due at aut in the early morning can sit in a queue at pandoh for half a day in august. coming from manali or kullu you never enter this stretch.

jibhi road conditions month by month

the jibhi road follows the weather, and the weather follows a tight calendar (the figures are on the jibhi weather and best time to visit pages, modelled from open-meteo, 2016-2025).

monthsaut to jibhi (nh 305)jalori passpandoh to aut (nh 3)
january, februaryopen; black ice before 10 am and after darkclosed to vehiclesopen; occasional snow and rockfall delays
marchopenusually still shut; reopens mid march to aprilopen
april to juneopen, dry, the easiest drivingopen to carsopen
july to mid-septemberopen most days; landslides shut it for hours to days after heavy rainopen but the banjar-anni side slips firstlandslide season: kainchi mod, 9 mile, dwada, jhalogi, hanogi
late september to novemberopen, dry; the best months for the driveopen, snow dusting possible from novemberopen
decemberopen; ice from mid monthcloses with the first heavy snow, mid to late decemberopen

closure examples from the tribune (aug 2025), the tribune (feb 2025) and the week (jan 2026); month pages such as jibhi in august and jibhi in january go deeper.

how do you check jibhi road status before you leave?

to check jibhi road status, start with your homestay the evening before and again at breakfast. hosts in jibhi and banjar hear from the aut taxi stand and the hrtc drivers hours before any website updates. they also know whether a slide at larji is a one-hour wait or a day. this beats every other source.

second, look at hrtc's booking site (online.hrtchp.com). if the kullu depot is still selling seats on the aut-jibhi buses or the kullu-anni service over jalori for today, the road is open to buses. third, after heavy rain or snow the state emergency operation centre in shimla publishes a daily count of closed roads by district. the tribune and other papers carry it each morning: look for kullu district, nh 305 and nh 3 in the text. google maps is often a day behind on mountain closures, so a green line is not proof.

what should you do if the road closes while you are in jibhi?

if the road closes while you are in jibhi, stay put: most aut-banjar closures clear within a day, and the village has food, homestays and signal. the road is cleared in stages, and small cars are let through before buses and trucks, as happened after 18 august 2025. do not try a kuchha side road or a night drive to beat the queue. keep a spare day at each end of a monsoon trip, and in winter keep the tank full and a day's cash, since power cuts follow heavy snow. the itineraries page builds that buffer in.

summary

  • on 19 november 2026 the aut to jibhi road and jalori pass were both open: hrtc was selling seats on buses 731, 824, 844 and 827 for 20-21 november.
  • the aut to banjar to jibhi road (nh 305, ~30 km) is open all year; it shuts for hours or days only after heavy rain or snow.
  • jalori pass, 12 km above jibhi, is closed to vehicles from mid or late december to about march (36 days off for buses in early 2025).
  • july to mid-september is landslide season on aut-banjar and on pandoh-aut (kainchi mod, 9 mile, dwada, jhalogi).
  • late september to november and april to june are the easy months for the drive.
  • check with your homestay, hrtc seat sales and the seoc closed-roads count; google maps lags a day.

jibhi road conditions: common questions

Is the road to Jibhi open in November 2026?

the road to jibhi was open on 19 november 2026, and so was jalori pass. hrtc's booking site that day was selling seats for 20 and 21 november on the aut to jibhi buses: 731 at 06:30 and 824 at 11:00, ₹83. it was also selling the two anni to kullu buses that cross jalori pass: 844 at 06:00 and 827 at 07:00, ₹112 to jibhi. jibhi village had no snow from 1 to 18 november and about 11 mm of rain. jalori pass had about 6 cm of modelled snowfall on 13 and 15 november (open-meteo), which did not stop the buses.

Is the road to Jibhi open today?

the aut to banjar to jibhi road (nh 305) is open in every season and only shuts for hours or days after heavy monsoon rain or a big snowfall. jalori pass, 12 km above jibhi, is the stretch that closes for months, from mid or late december to about march. check the live weather box on this page: steady rain in july-september or snow in december-february is the signal to call your homestay before you drive.

Is the Aut to Jibhi road closed in the monsoon?

not usually, but it does close for hours or days after heavy rain. on 18 august 2025 landslides stopped all traffic on the aut-banjar road (the tribune). the aut to jibhi stretch reopened first for small vehicles while the jalori road stayed shut. from july to mid-september keep a spare day at each end of the trip.

Is Jalori Pass open right now?

jalori pass was open on 19 november 2026: hrtc was selling seats on its anni to kullu buses over the pass for 20 and 21 november. jalori pass is open to cars from about april to mid december. snow closes nh 305 over the pass from mid or late december until march. in february 2025 about 25 cm of snow on 5 february shut it to all vehicles, days after buses had come back from a 36-day closure. nhai reopened it for 4x4s only by 9 february (the tribune). in january 2026 it was blocked along with 56 other kullu roads (the week).

Where does the Delhi or Chandigarh to Jibhi highway get blocked?

the weak stretch is pandoh to aut on the chandigarh-manali highway (nh 3), in the mandi gorge before you turn off for jibhi. in august 2025 landslides at kainchi mod closed it. after an 18-hour closure on 9-10 august only one-way traffic ran at 9 mile, kainchi mod, dwada and jhalogi (the tribune). light vehicles were diverted via kamand and kataula.

How do you check Jibhi road conditions before leaving?

call your homestay the evening before: hosts hear from the aut and banjar taxi drivers hours before the news does. check whether hrtc is still selling seats on the aut-jibhi or kullu-anni buses at online.hrtchp.com. after heavy rain or snow, the tribune and other papers carry the state emergency operation centre's daily count of closed roads by district. look for kullu district and nh 305. google maps often shows a closed mountain road as green for a day.

What is the Aut to Jibhi road like to drive?

the aut to jibhi road is nh 305, a national highway since 2012, but narrow in practice. expect single-lane patches, potholes and no lights. banjar residents protested its condition in april 2025 (the tribune). it is about 30 km and takes about an hour in daylight. do not drive it after dark.